Only 3 weeks and 1 day to go.........the pressure is really building. We hope to have the garden pretty much pre-built by the end of this week, in a warehouse in Walthamstow. We've had a few hiccups along the way:
1) Pergola collection; van wasn't big enough to take the 4.2m span of metal! so had to send separate courrier
2) Granite work surface got cut to wrong size - its a long story won't bore you with it.
3) Holes on pergola not quite right size for the LED strip lights inside
.................anyhow, at the end of the day, all have been rectifiable so no real problems.
Got a lovely photo of the newly planted edible wall, will upload a picture.
Pat Fox 27.4.09
1) Pergola collection; van wasn't big enough to take the 4.2m span of metal! so had to send separate courrier
2) Granite work surface got cut to wrong size - its a long story won't bore you with it.
3) Holes on pergola not quite right size for the LED strip lights inside
.................anyhow, at the end of the day, all have been rectifiable so no real problems.
Got a lovely photo of the newly planted edible wall, will upload a picture.
Pat Fox 27.4.09
No comments:
Post a Comment